Oklo Inc. (OKLO) earnings date
Mar 22, 2027, after close estimated
Estimated from the company's SEC filing cadence. The company has not confirmed it. Companies usually announce two to four weeks ahead.
- Fiscal period
- Q4 FY2026
- Confidence
- 15% chance of landing within a day
- Source
- Filing history on EDGAR
- Last checked
- 2026-11-19
Read by software from public filings and company announcements. Can be wrong. Verify with the company or the SEC. Not investment advice.
How this company behaves
| Announces its report date | Not enough announcements on file yet to say |
| Reports after the quarter ends | 3 releases on file; at least 4 are needed |
Last 3 releases
| Period | Released | Timing | Days after period end | Filing |
|---|---|---|---|---|
| Q4 FY2024 | Mon, Mar 24, 2025 | after close | 83 | 8-K |
| Q3 FY2024 | Thu, Nov 14, 2024 | after close | 45 | 8-K |
| Q2 FY2024 | Tue, Aug 13, 2024 | after close | 44 | 8-K |
What they guided beta
| Q4 FY2024 | "As the only company with both a site use permit and secured fuel for our first deployment, Oklo remains on track to deliver commercial power by the end of 2027, backed by a strong and growing customer pipeline." exhibit |
| Q4 FY2024 | "Completed acquisition of Atomic Alchemy, enabling accelerated radioisotope production Entered into strategic partnership with RPower to provide customers with a natural gas bridge to nuclear power Designated Siemens Energy as Oklo’s preferred supplier of power conversion technology Partnered with Oak Ridge National Laboratory to advance structural material testing to enhance durability and optimize manufacturing Corporate development Expanded powerhouse offering to scale to a 75 MW design to meet customer demand Secured key U.S. Department of Energy (DOE) approvals, including a Memorandum of A" exhibit |
| Q4 FY2024 | "Backed by a DOE site use permit, the project is on track for deployment in late 2027 to early 2028." exhibit |
| Q4 FY2024 | "Oklo’s first powerhouse will be fueled with fuel fabricated at the Aurora Fuel Fabrication Facility at INL, for which Oklo is currently seeking DOE authorization. 11 12 Oklo to submit NRC application for first Aurora powerhouse in 2025 Oklo’s custom COLA includes: 20 40 60 80 100 Time (months) Design Certification 24–36 months 36–42 months *Done by design developer, includes just design scope. **Done by design developer with operator (e.g., utility), includes financial information, siting information, environmental report, operational and security programs, etc." exhibit |
| Q4 FY2024 | "Oklo remains on track to deploy our first Aurora powerhouse in late 2027." exhibit |
| Q3 FY2024 | "Project Execution Corporate & Business Development Began site preparation for Oklo's first powerhouse Signed term sheet to acquire Atomic Alchemy The Memorandum of Agreement (MOA) with the DOE was signed in September 2024 and allows Oklo to conduct site investigations at our preferred site in Idaho." exhibit |
| Q3 FY2024 | "With a proven model, early market entry, and reliable baseload power, we believe Oklo is poised to lead in this space.* 4 Growing support for nuclear energy development Data center boom drives shift toward nuclear energy Major market developments AI power use projected to outpace capacity this decade AI power demand is expected to grow rapidly by 2030, projected to outpace server capacity despite advancements in server efficiency and the development of more energy-efficient AI technologies and applications.2 0 0.0 50 1.0 100 2.0 150 3.0 200 4.0 250 AI Power use, TWh AI Power demand Power us" exhibit |
| Q3 FY2024 | "Upon closing, Atomic Alchemy is expected to have minimal immediate impact on Oklo’s operating cost structure, and the transaction is not expected to have impact on Oklo’s previously announced 2024 outlook." exhibit |
| Q3 FY2024 | "Oklo and Atomic Alchemy’s facility, expected to be online in 2028/2029, will address this need." exhibit |
| Q3 FY2024 | "MASSIVE MARKET DEMAND DIVERSE REVENUE OPPORTUNITIES The market for medical radioisotopes is estimated to be $55.7 billion by 2026,7 with other sectors expected to grow rapidly with increases in radioisotope supply." exhibit |
Get this as JSON
curl -H "X-API-Key: vt_live_..." https://api.veritasdata.dev/v1/next/OKLO
# how far back the record goes for this company
curl -H "X-API-Key: vt_live_..." https://api.veritasdata.dev/v1/coverage/OKLO
Put this date on your page
A badge that stays current. It links back to this page and needs no key. Embed it unmodified, with its link to this page intact: the badge is too small to carry the notice below, so the page it links to does.
Read by software from public filings and company announcements. Can be wrong. Verify with the company or the SEC. Not investment advice.
HTML
<a href="https://veritasdata.dev/company/OKLO/"><img src="https://veritasdata.dev/embed/OKLO.svg" alt="OKLO earnings date" width="240" height="56"></a>
Markdown
[](https://veritasdata.dev/company/OKLO/)
Script
<script async src="https://veritasdata.dev/embed/OKLO.js"></script>
Get a free key: 100 calls, every company
Sign in with GitHub or Google. The key works on every endpoint and in the MCP server.
curl -H "X-API-Key: vt_live_..." "https://api.veritasdata.dev/v1/next/OKLO"